Mayo Clinic AZ Forward – East and West Expansions

The East Tower Levels 4 through 7, buildout includes cabling for the Nurse Call, Video Security and Access Control, Speakers and DAS Systems including 3 OR’s, PACU bays, exam rooms and Doctors’ offices. The tower will eventually be built out to 16 stories.
The 7-story West Tower expands various clinical programs including the Emergency Dept. (ER), labs, intensive care, med surg and observation beds, radiology, including a new MRI 7T, and other support areas. In addition, approximately 20,000 SF of tenant improvement work is needed to tie into the existing Hospital, including check-in/sub-waiting, conference rooms, office/workrooms, and storage on the first floor and sub-waiting and storage and connection into the existing tower on the second and third floors.
Completion
  • 2023 and 2024
General Contractor
  • Direct to Mayo Clinic
Size
  • East Tower – 330,000 SF
  • West Tower – 583,300 SF
Services Provided
  • DataComm
  • Low Voltage Systems:
    • Security / Access Control
    • Code Blue/Paging and Intercom Systems
    • Nurse Call
    • Distributed Antenna System (DAS)