ASU Tempe District Utility Plant (TDUP)

The new Tempe District Utility Plant is designed to enhance electrical and thermal capacity for ASU’s campus, supporting the Mill Avenue student housing project and future growth. This sustainable, LEED Silver-targeted facility features thermal energy storage to reduce emissions and acts as a “living lab” with visible, tourable engineering systems.
Completion
  • May 2026
General Contractor
  • Willmeng Construction
Size
  • 20,000 Square Feet
Services Provided
  • Design Assist
  • CAD/BIM
  • DataComm
  • Low Voltage Systems – Distributed Antenna System (DAS)